Site-Built Homes
Building Code Adherence & Construction
Homes are built to comply with the National Building Code (NBC) as adopted by the provinces and are subject to the New Home Warranty as per the provincial legislation. Homes are built using “outside-in” construction, where the initial framing is done first, followed by internal components.
Construction Conditions
Homes built outdoors in all weather conditions where materials are exposed to weather elements and where the home site is also exposed to potential vandalism and theft.
Coordination of Trades
Generally, one general contractor will have a number of projects on the go at the same time. The coordination of trades is a challenging and time consuming task during site-built construction as they must travel between construction sites to set-up equipment and perform their duties where weather, equipment transport and other factors can lead to expanding timelines. Though the general contractor may utilize particular trade workers from job site to job site, there is no clarity around their training consistency.
Construction Inspection
Inspectors must be called by the general contractor at each stage of construction; however, the contractor must wait to continue construction until the inspector schedules an appointment to inspect and approve what has been constructed prior to moving on with their processes.
Modular Built Homes
Building Code Adherence & Construction
Homes are built to comply with the National Building Code (NBC) as adopted by the provinces where they will be placed and are subject to the New Home Warranty Program as per the provincial legislation and the individual manufacturers’ warranty. Homes are built using “inside-out” construction, where the internal components are built first, followed by connecting the outside framework.
Construction Conditions
Homes are built in controlled conditions (indoors) where materials are protected throughout the building process from both weather and potential vandalism.
Coordination of Trades
An internal quality control program & continuous monitoring are used throughout the building process. All trades are highly skilled and trained on in-house assembly processes, thus allowing for superior building consistency. All materials and tools are available and at the ready of workers at each work station, allowing for minimized loss of time for walking, set-up and down-time of equipment.
Construction Inspection
Due to the use of assembly processes, precision work and attention to detail are inspected at each stage of construction.